English 中文
Mackay Hospital Redevelopment 
 
   


Woods Bagot, in conjunction with Billard Leece Partnership, was appointed as Principal Consultant and Architect for the Mackay Base Hospital Redevelopment. The AUD405 million project will be delivered in a three-stage sequential program and is due for completion in 2013. A detailed study of the existing buildings informed the proposed retention, refurbishment and demolition strategy, offering best value to the overall project and assisting the proposed staging.

The masterplan proposes a new acute hospital, rebuilding of the Main Entrance building as well as a light refurbishment of the Women’s and Children’s, Dental and Allied Health buildings.

The resultant masterplan employed Woods Bagot's Design Intelligence methodology which resulted in a major reform of the existing masterplan. The Woods Bagot masterplan and strategy has resulted in more new construction and less refurbished works, a reduction in the original construction program and a greater alignment with the intended model of care / services. The design also responds to the tropical climatic conditions of Mackay and includes allowances for beyond business-as-usual environmental considerations providing for a more flexible and pragmatic future proofing solution.